FREE Quotes — Call +1 (862) 366-7732100% Accuracy Rate — Guaranteed24-48 Hour Turnaround — Rush AvailableServing All 50 States — Local PricingLicensed & Insured — 15+ Years ExperienceFREE Quotes — Call +1 (862) 366-7732100% Accuracy Rate — Guaranteed24-48 Hour Turnaround — Rush AvailableServing All 50 States — Local PricingLicensed & Insured — 15+ Years Experience
Case Study — Residential Electrical Estimating

Multifamily Electrical Takeoff: 520 Units in 3 Days

Case study: Two 6-story apartment buildings with underground parking — complete electrical takeoff delivered ahead of a 5-day bid deadline.

Client Challenge

A regional GC was bidding a 520-unit multifamily apartment complex — two 6-story buildings with underground parking, rooftop mechanical units, and clubhouse amenities. The bid deadline was 5 days, and the GC's estimator was covering 14 other active bids simultaneously. They needed a complete electrical material takeoff and labor estimate broken out by building and by CSI division.

Our Approach

We assigned two estimators to run parallel takeoffs — one for Building A, one for Building B. Using Bluebeam Revu and PlanSwift, we counted every fixture, device, panel, and conduit run. We also produced a panel schedule summary and a preliminary load calc for each service entrance. Labor hours were calibrated to local market rates for multifamily construction. The final deliverable included separate Excel tabs for each building plus a combined summary tab for the bid.

Results

Delivered 4 hours ahead of schedule. The GC used our takeoff as the baseline for their electrical sub-bid package. The project broke ground within budget, and the electrical contractor told us our material counts were within 1.8% of their final order.

"The parallel takeoff approach was genius — we got two buildings done in the time it would have taken our one guy to finish one. The Excel tabs made it easy to merge into our bid package."

— Regional General Contractor, Southeast

Key Metrics

520
Apartment Units
1.8%
Material Count Accuracy
4 Days
Turnaround Time

Related Services

Available for new projects

Ready to Submit Better Bids?

Send your plans. Get the number. Win the work. Stop spending 20 to 40 hours on takeoffs that could be handled in 48.

100% Accuracy
24-48h Turnaround
Flat-Fee from $65